Acceptance of Job Training PT. Pertamina RU IV Cilacap on behalf of students:
Period of implementation of practical work 01 July – 01 August 2018
A letter of acceptance from the company can be downloaded here
A follow-up meeting on collaboration between the ITS Department of Materials and Metallurgical Engineering (DTMM ITS) and PT Komatsu
SIDOARJO – The deep-colored wastewater produced from synthetic dyes has long been a major challenge for many small-scale batik
SIDOARJO – In an effort to strengthen food resilience in urban areas, students of the Community Service Program (KKN)