Tentang Kami

| No | Nama Penyumbang | Sumber Dana | Nama Barang | Jumlah Hibah |
|---|---|---|---|---|
| 1 | Dimas Eko | K-38 | Sound system kelas | Rp. 20.000.000 |
| 2 | Sundarto | K-29 | Papan Nama Lab | 10.000.000 |
| No | Nama Penyumbang | Sumber Dana | Nama Barang | Status |
|---|---|---|---|---|
| 1 | Muhajir | PT. PQ Silicas Indonesia | 1. Laboratory Oven 105°C 2. LECO CS 300 | OK / 2017 |
| 2 | Rina Triastuti., ST | K-34 | Microscope Olympus CX-23 | OK / 2017 |
| 3 | Ir. Ketut Rusnaya., MM | Altekimits | 1. New Sriring Hot Plate, Cimarec+2 Digital £SP88857107 2. Biological Miscroscope Binocular Model E100, Nikon 3. Menchtop pH Meter HI2210, Hanna with 0.01 pH Resulotion 4. Analytical Balance, Pioneer PA214, Ohaus 5. UV Vis Spectrophotometer genesis 10 UV, ThermoSci without Printer 6. PC Desktop HP P0221 core i5-6400T Printer Brother Inkjet Multi Fungsi DCP-T300 | OK / 2017 |
| 4 | Ir. Munir Amsyari., MM | Altekimits | Pembangunan Ruang Himatekk | OK / 2017 |
| No | Nama Penyumbang | Sumber Dana | Nama Barang | Status |
|---|---|---|---|---|
| 1 | Prof. Dr. Ir. Sugeng Winardi., M.Eng | K-14 | Kantin / Cafe Jurusan (80jt) | OK / 2016 |
| 2 | Dr. Lailatul Qadariyah., ST., MT | K-35 | Kantin / Cafe Jurusan (10jt) | OK / 2016 |
| 3 | Fadlilatul Taufany., ST., Ph.D | K-39 | Safety Sign (21jt) | OK / 2016 |
| 4 | Ir. Agung | K-30 | Gazebo (mushola) (159jt) | OK / 2016 |
| 5 | Ir. Arief Wisnu | Altekimits | Perbaikan Ruang Musik (13.5jt) | OK / 2016 |
| 6 | Nur Yadi., ST | K-45 | Fasilitas air siap minum (10jt) | OK / 2016 |
| 7 | Nur Yadi., ST | K-45 | Kantin / Cafe Jurusan (8jt) | OK / 2016 |
| 8 | Elien., ST | K-36 | Renovasi area pingpong dan meja pinngpong (20.5jt) | OK / 2016 |
| 9 | Ir. Hanafi Pratomo | Dosen Purna Tugas | Perry's Chem Eng dan Plant Design (6.6jt) | OK / 2016 |
| No | Nama Penyumbang | Nama Barang | Status |
|---|---|---|---|
| 1 | IKA Altekimits | Pembangunan Aula (100 jt) | OK/ 11 April 2014 |
| 2 | Semen Indonesia | Pembangunan Aula (100 jt) | OK/11 April 2014 |
| 3 | K-29 | 1. Kursi Sandar Besi Stainless Stell warna merah isi 4 kursi (2 buah) 2. Kursi tanpa sandar warna hitam isi 4 kursi (1 buah) 3. Mading Pengumuman Mahasiswa (2 Buah) (Total Nilai = 3.750.000) | OK / Juni 2014 |
| 4 | IKA Altekimits | Beasiswa (102 jt) | OK/Oktober 2014 |
| No. | Penyumbang | Nama Barang | Status |
|---|---|---|---|
| 1 | K-46 | Meja Pingpong (3 jt) | OK / Maret 2013 |
| 2 | IKA Altekimits | Sumbangan Pohon Mangga (50 Pohon) | OK / Maret 2013 |
| 3 | IKA Altekimits | Autoclave (50L) (59 jt) | OK / Agustus 2013 |
| 4 | IKA Altekimits | Spectrophotometer (24 jt) | OK / Agustus 2013 |
| 5 | IKA Altekimits | Shaker (45 jt) | OK / Agustus 2013 |
| 6 | IKA Altekimits | Parsel Lebaran Dosen Purna Tugas (Rp.9.500.000) | OK / Agustus 2013 |
| 7 | IKA Altekimits | Insentif Lebaran Karyawan (33 Orang senilai Rp. 4.950.000) | OK / Agustus 2013 |
| 8 | K-33 | Sumbangan Pohon Mangga (5 Pohon) | OK / September 2013 |
| 9 | K-33 | Sumbangan sembako untuk karyawan (35 orang) | OK / September 2013 |
| 10 | IKA Altekimits | Beasiswa (90jt) | OK / September2013 |
| NO | PENYUMBANG | NAMA BANTUAN | STATUS |
|---|---|---|---|
| 1 | IKA Altekimits | Beasiswa (63,6jt) | OK |