News

Foto bersama Webinar Series #8 DTIS

Latest News

  • JOB VACANCY – QS DRAFTER

    JOB VACANCY – QS DRAFTER PT Mitra Surya Persada, a company specializing in General Contracting and Steel Structure construction,

    17 Jul 2026
  • Career Opportunity for Civil Engineering Graduates at PT Binatel Prima

    Career Opportunity for Civil Engineering Graduates at PT Binatel Prima PT Binatel Prima, a company operating in the Construction,

    16 Jul 2026
  • Capstone Design Exhibition 2026 at ITS Tower 3

    Capstone Design Exhibition 2026 marked a special milestone for the Department of Civil Infrastructure Engineering (DTIS), Faculty of Vocational

    25 Jun 2026