{"id":1894,"date":"2025-09-24T15:47:22","date_gmt":"2025-09-24T08:47:22","guid":{"rendered":"https:\/\/www.its.ac.id\/publikasi\/?p=1894"},"modified":"2025-09-24T15:47:22","modified_gmt":"2025-09-24T08:47:22","slug":"overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province","status":"publish","type":"post","link":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/","title":{"rendered":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE"},"content":{"rendered":"<section class=\"item authors\">\n<ul class=\"authors\">\n<li><span class=\"name\">Bagas Firman Maulana<\/span><span class=\"affiliation\">Department of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia<\/span><\/li>\n<li><span class=\"name\">Moch. Abdul Kholiq<\/span><span class=\"affiliation\">Department of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia<\/span><\/li>\n<\/ul>\n<\/section>\n<section class=\"item doi\">\n<h2 class=\"label\">DOI:<\/h2>\n<p><span class=\"value\"><a href=\"https:\/\/doi.org\/10.12962\/j27745449.v5i3.2723\">https:\/\/doi.org\/10.12962\/j27745449.v5i3.2723<\/a><\/span><\/section>\n<section class=\"item keywords\">\n<h2 class=\"label\">Keywords:<\/h2>\n<p><span class=\"value\">cut and fill, overburden, volume<\/span><\/section>\n<section class=\"item abstract\">\n<h2 class=\"label\">Abstract<\/h2>\n<p>Overburden is all layers of soil\/rock that are above and directly cover the layer of valuable mining materials so that they need to be removed first before being able to dig up the valuable mining materials. In the process of removing overburden, its volume needs to be calculated. One method that is often used is the cut and fill calculation method. The cut and fill calculation method can be done using several software, including Surpac and Civil 3D. This study discusses the calculation of overburden volume based on data obtained from detailed topographic measurements of the situation at PT. Riung Mitra Lestari jobsite RHML located in Tapin Regency, South Kalimantan. This data consists of situation coordinate data from July 29 &#8211; August 21, 2024. The purpose of this report is to calculate overburden using Surpac and Civil 3D software. From the calculations, the overburden volume was obtained as much as 309,569 BCM in Surpac software and 310,548 BCM in Civil 3D software.<\/p>\n<\/section>\n<p><a href=\"https:\/\/journal.its.ac.id\/index.php\/jmest\/article\/view\/2723\">https:\/\/journal.its.ac.id\/index.php\/jmest\/article\/view\/2723<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bagas Firman MaulanaDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia Moch. Abdul KholiqDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia DOI: https:\/\/doi.org\/10.12962\/j27745449.v5i3.2723 Keywords: cut and fill, overburden, volume Abstract Overburden is all layers of soil\/rock that are above and directly cover the layer of valuable mining materials so that they need [&hellip;]<\/p>\n","protected":false},"author":250,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[131],"tags":[],"class_list":["post-1894","post","type-post","status-publish","format-standard","hentry","category-jmest-jurnal"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )\" \/>\n<meta property=\"og:description\" content=\"Bagas Firman MaulanaDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia Moch. Abdul KholiqDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia DOI: https:\/\/doi.org\/10.12962\/j27745449.v5i3.2723 Keywords: cut and fill, overburden, volume Abstract Overburden is all layers of soil\/rock that are above and directly cover the layer of valuable mining materials so that they need [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\" \/>\n<meta property=\"og:site_name\" content=\"IJC ( ITS Journal Center )\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-24T08:47:22+00:00\" \/>\n<meta name=\"author\" content=\"itspublikasi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"itspublikasi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\"},\"author\":{\"name\":\"itspublikasi\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a\"},\"headline\":\"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE\",\"datePublished\":\"2025-09-24T08:47:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\"},\"wordCount\":232,\"commentCount\":0,\"articleSection\":[\"jmest jurnal\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\",\"url\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\",\"name\":\"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )\",\"isPartOf\":{\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#website\"},\"datePublished\":\"2025-09-24T08:47:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.its.ac.id\/publikasi\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#website\",\"url\":\"https:\/\/www.its.ac.id\/publikasi\/\",\"name\":\"IJC ( ITS Journal Center )\",\"description\":\"Institut Teknologi Sepuluh Nopember\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.its.ac.id\/publikasi\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a\",\"name\":\"itspublikasi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1c672fdec2c22686bbf54db48608a7cbb61f01783efa5776676dd183144eeffd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1c672fdec2c22686bbf54db48608a7cbb61f01783efa5776676dd183144eeffd?s=96&d=mm&r=g\",\"caption\":\"itspublikasi\"},\"url\":\"https:\/\/www.its.ac.id\/publikasi\/author\/itspublikasi\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/","og_locale":"en_US","og_type":"article","og_title":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )","og_description":"Bagas Firman MaulanaDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia Moch. Abdul KholiqDepartment of Geomatics Engineering, Institut Teknologi Sepuluh Nopember, Surabaya Indonesia DOI: https:\/\/doi.org\/10.12962\/j27745449.v5i3.2723 Keywords: cut and fill, overburden, volume Abstract Overburden is all layers of soil\/rock that are above and directly cover the layer of valuable mining materials so that they need [&hellip;]","og_url":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/","og_site_name":"IJC ( ITS Journal Center )","article_published_time":"2025-09-24T08:47:22+00:00","author":"itspublikasi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"itspublikasi","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#article","isPartOf":{"@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/"},"author":{"name":"itspublikasi","@id":"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a"},"headline":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE","datePublished":"2025-09-24T08:47:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/"},"wordCount":232,"commentCount":0,"articleSection":["jmest jurnal"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/","url":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/","name":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE - IJC ( ITS Journal Center )","isPartOf":{"@id":"https:\/\/www.its.ac.id\/publikasi\/#website"},"datePublished":"2025-09-24T08:47:22+00:00","author":{"@id":"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a"},"breadcrumb":{"@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.its.ac.id\/publikasi\/2025\/09\/24\/overburden-volume-calculation-using-cut-and-fill-method-at-rhml-jobsite-riung-harapan-mitra-lestari-pt-riung-mitra-lestari-tapin-regency-south-kalimantan-province\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.its.ac.id\/publikasi\/"},{"@type":"ListItem","position":2,"name":"OVERBURDEN VOLUME CALCULATION USING CUT AND FILL METHOD AT RHML JOBSITE (RIUNG HARAPAN MITRA LESTARI) PT. RIUNG MITRA LESTARI, TAPIN REGENCY, SOUTH KALIMANTAN PROVINCE"}]},{"@type":"WebSite","@id":"https:\/\/www.its.ac.id\/publikasi\/#website","url":"https:\/\/www.its.ac.id\/publikasi\/","name":"IJC ( ITS Journal Center )","description":"Institut Teknologi Sepuluh Nopember","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.its.ac.id\/publikasi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/a179b56af3384d2725331f97a85b3e7a","name":"itspublikasi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.its.ac.id\/publikasi\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1c672fdec2c22686bbf54db48608a7cbb61f01783efa5776676dd183144eeffd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1c672fdec2c22686bbf54db48608a7cbb61f01783efa5776676dd183144eeffd?s=96&d=mm&r=g","caption":"itspublikasi"},"url":"https:\/\/www.its.ac.id\/publikasi\/author\/itspublikasi\/"}]}},"_links":{"self":[{"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/posts\/1894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/comments?post=1894"}],"version-history":[{"count":1,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/posts\/1894\/revisions"}],"predecessor-version":[{"id":1895,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/posts\/1894\/revisions\/1895"}],"wp:attachment":[{"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/media?parent=1894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/categories?post=1894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.its.ac.id\/publikasi\/wp-json\/wp\/v2\/tags?post=1894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}