The North Ring Road of Lamongan Project Section I, which stretches from Sta. 0+000 to Sta. 3+265, is indicated to be built on soft silt soil. This paper discusses the effect of Prefabricated Vertical Drains (PVDs) length on the amount of settlement that occurs in soft soil. The method used was to compare the installation of PVDs at a quarter, half and three quarters of the thickness of the compressible soil layer. The varying lengths of PVDs were modeled on PLAXIS2D software. The results show that the longer PVDs are installed in the compressible soil, the greater settlement occurs.
Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar, Reza Kazhimi Abstract Probolinggo – Banyuwangi Toll Road is
Henniko Okadha, Herman Wahyudi, Yudhi Lastiasih, Sifa’ Udukha Abstract The North Ring Road of Lamongan Project Section I,
Dinul Hadi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya, Noor Fachrie Abstract Road and bridge construction of the
Fanny Rumintha Br Barimbing, Yudhi Lastiasih, Herman Wahyudi, Sifa` Udukha Abstract The construction of the Lamongan North Ring