Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550

Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar, Reza Kazhimi   Abstract Probolinggo – Banyuwangi Toll Road is part of the National Strategic Project, has a length of 172 km which is divided into 7 sections. One of the challenges faced is soft soil, where information is obtained in section 3 precisely STA 40 […]